Notice:LT group is looking forward to co‌→'operate with worldwide frie↔↑©σnds !
Blog
Blog
Your position now:Home > Blog

Fe500 Soil Nails - Rock Bolt

[ Time:2019-03-25 Click:1737 ]


  China Soil Nail Supplier - Anyan∑‍£$g Longteng Heat Treatment Material Co.←>,Ltd, expert selling high yield s♥≈αtrength and tensile s≤<☆trength pretensioning rebar soil n ¶↕ail rock bolt.

DSC_1595-2

HTB1aYR2X9Ct61JjSZFqq6zPqpXaX

 

 

 

 

 

 

 

timg (2)_副本_副本Product Drawing  &≤β€αnbsp; 

ROCK BOLT DRAWING

1   BAR;&nb<"™sp;    2 ¶&  NUT;   3&nbsφ±♦p;  NYLON WASHER; &nbδ₽sp;4   DOME WASHER;&nλ↓bsp; 5    PL÷¥↔πATE;   L   LEN₹&GTH OF BAR;   l  &nbs✔$∑§p; LENGTH OF THREADE ₹​D PORTION;    γ☆;M  DIAMETER OF BAR

 

timg (2)_副本_副本What is Soil Nails?  &n$δ→‌bsp;       & ∏nbsp;           &nbs₽πp;      <÷™;       &←₹§Ωnbsp;       &☆→γnbsp;       &¶$₽"nbsp;      ↔≠;       &n∞ bsp;         &nbs♣×p;       &nα÷πbsp;       &¶☆←εnbsp;        

Soil Nails is a whole assembly for stab→Ωilizing slopes and side hil>®₩"l cuts or rock, also for stπ↓♣₽abilizing constructi​πon pit walls if deformations↑®<♣ are irrelevant.  The bolt is nai← ™↓led into soil to secure area≠§ααs of slope location. Consequently, te♦Ωnsile and shear force™✔s act on the nail.  The soil±‌ nail system do not ac¥♣±<t individually, but as a compσ₩★lete nailing system.

 

timg (2)_副本_副本Product Specification&δ₩<¶nbsp;             π        &nb₹♦§$sp;         &nb‌™€sp;       ¥÷↓      &n≈§β¥bsp;          ₹≠;         &n→∏λ∑bsp;     &nbφ™sp;     &nbs↕©™p;           &∏       &↔α¶≥nbsp;

soil nails specification

timg (2)_副本_副本Mechanical Properties   ©​           &nb→↓sp;         &β€ε•nbsp;      €∞↓       &&λ™nbsp;         &nbs☆∑♣‌p;        €φ;     &nbs∏™p;     &nb<₽£ sp;       &nbsσ‍∏•p;       &nb✔​$sp;     &nb™©sp;    

soil nails mechanical properties

timg (2)_副本_副本Application     

      ≠ ↔♦        &n★ bsp;       &nbs•&↑∑p;         &★↓nbsp;          ☆Ω•';         ε÷<β      &nb↕✔♥σsp;         &§$​¶nbsp;     &n©$bsp;       &n≠✔₽>bsp;     &n∞₩≠☆bsp;       &≤×nbsp;     &nb≈ $εsp;    

  • Fixation 
  • Rock Stabilization
  • Slope Stabilization&↕≤εnbsp;
  • Embankment stabiliza ≤>♥tion
  • Excavations 
  • Fixation of rock fall mδ€∏¥esh
  • Avalanche barriers

 

timg (2)_副本_副本Product Installation    &♥€↑φnbsp;     ™↔£₩        &ε↑×nbsp;         &nbs↑÷p;        ÷$;        ±<÷;         &nbs≤✘αp;         &nbs₩§ p;          ‌λ☆↓        ∞♠✘           €€       Ω€±×;       & →nbsp;    

1 According to desigβ♥ n requirement, posit♥λ∞•ion and confirm holes lo↓♥ cations, and drill holes.

2 Blow away rock powd☆  ers

3 Pull the adhesive to hole∑'αεs bottom, hold the rock bolt bar©•>↓ and stir adhesive at the same time. K∑βΩeep on stiring to th≥ε§e required time period. discharge ↔×stiring equipment and wa&↑↕it for a specific time according ♣€™↓to the adhesive requirement. Then disch •arge stiring connector, and instal"≈l rock bolt accessor←$ies - plate, dome washer, w★Ω↓λasher, nut. Nuts should  ₩be tightened by special w​λ÷rench.

 

timg (2)_副本_副本Successful Projects:    &n‍×'✔bsp;     &n<"↔bsp;         &nb₹↑>↓sp;          π¶•®           &nb∏φ↓sp;          →∑®•       ✔‌          &nα‌ε¶bsp;       &nbβ✔★sp;      ∞α         &nε•×bsp;         '≠        ×®        & $•nbsp;       π®       

QQ截圖20181106141836QQ截圖20181106141739

QQ截圖20181106141822QQ截圖20181106141716

 

Add: Industrial Park, Indu District, A♦✔♥nyang City, Henan Province, P.R.Chσ'Ω∞ina

E-mail: infor@aqjiuxing.net

Whats app: 0086 183173→∑★51307

Web: www.longtonsteel.com  /en


Email:info@aqjiuxing.net Tel:0372 22®γδ56782  
Add: Industrial Park, Indu ¶♦District, Anyang City, Henan Provinceδγ, P.R.China
Anyang Longteng Heat Treatment Materia>↕ ¶l Co.,Ltd. ©  
京ICP證000000号
plus