Notice:LT group is looking foΩ★rward to cooperate with worldw¥&σide friends !
Blog
Blog
Your position now:Home > Blog

PACKAGING - WIND TOWER ANCHOR BOLT

[ Time:2021-05-15 Click:656 ]§‍✔↑


Packaging method is  ↕always one of the mos‍♣"→t important part of purchasing, es÷'•₹pecially for the wind tur←‍α•bine foundation cage an★≤chor bolt. After finish main produ ‍Ω>ction part, we need to maσΩ‌ke full pole packaged, in order to e>∞nlarge the products lif₩‌ ¶e span and maintain th'×÷eir good property and performance♠Ω★.

For this purpose, our company tried ←δ so many ways. Our Longteng Technicα→σ​al Center posted 5 methods×₽ of anti corrosion packaging, m∞‌δεade test and take photos to every ↑<™method for recording. After many tes£ααt, our team gave a final best method fo®"↕σr our wind tower foundation anchor stu©↑∏d bolts. Our company own this pφ$♦atent of anti-cossos®φion packaging method.

ANTI CORROSION PACKAGING       &" ←nbsp;       &nbs♥£€p;           ‌£          &nbsβγπp;      ™•       λβ      &¥ Ω€nbsp;       &↕♦≠ nbsp;       ®​ ↑      &nb♠&→sp;       &> ¥nbsp;     ★   

1. Acc. to"Anto-corrosion Notice¶<©",make sure PVC ✘∞‍₩pipe's length, anto-corr±₩©osion method,thread exposire length,d≈λ εistence between seals,<✔numbers of steel poles in each packa"λge.

2. anti-corrosio₽≤n method

Grease on poles;bound anti-corrosion be¶∑lts(Layer upon layer),grease₹β  pm belts' surface;pu←σ​¶t on PVC pipes

Requirements:Grease should b∏'£e spread evenly;anti-corrosion belts sh ​ould be tight, full cover of eachεφ$♣ pole,exposed areas of™™↑ε pole body is not allowed; after putti∑₩₩ng on PVC tube,seal buts,cap, measure t< ‍λhe length of exposed thread part↔✘, and distance between seal ares;exp★♣ osed thread fully grease and put on thrεσead caps.

We use anti-corrosion grease+anti-cor™γ↕αrosion belt +PVC tube+≥÷>sealing nut to achie♥<"•ve the purpose. After"§↕ 1000 hours’ salt spray te‍≠st, there will be no cor₩πrosion on the products’ suδλ≈rface.

 

圖片1 圖片2

Packaging      ↓®←      &nφδ☆♠bsp;     &nbs​£δ≠p;       '÷      &n♣™βbsp;         &nbs ✘≠p;           &✘≥nbsp;         &n<'×bsp;     &nbsγ‌ p;       £           &nbs‍λp;         &nbs€©↕♥p;          ₽∏Ω        ♣✘β∞        §π✔;     &nbs•β★p;       

Use bolts,nuts steel channels ∏ for packing frame.10# s≠'teel channel punched andβ> ® be the bottom, M24 bolts and M24 n✔Ω‍​uts prop up, 8# steel c↔↓Ωhannel punched and sea✔π✔★l the top.

Packaging frame shoulΩ d have a appropriate tight δness. Neither let the PVC TUB≤σ↑₩E be flattened deformation , nor let th®¶←$e steel poles slip out of th≥Ω∞e packages.

During or after packaging, if PVC  ←pipes are fond fracted,should change a new one immediately♥♦ ∏.

DSC_1421

 

Contact us now!

Anyang Longteng Heat Treatment¥®Ω& Material Co.,Ltd

Add:  Industrial Pε↓ark, Indu District, Anyan≤×↔g City, Henan Provinγ∞•ce, P.R.C.

TEL:  +86-372-2256782

Email: infor@aqjiuxing.net


Email:info@aqjiuxing.net Tel:0372 2256782→'    
Add: Industrial Park, Indu♠λ District, Anyang Ci♥☆λty, Henan Province, P.R.China
Anyang Longteng Heat Treatment Materi> al Co.,Ltd. ©  
京ICP證000000号
plus